20. Design and Construction of Water Well for UP HQ Dor Baba
Project Name and Location
Design and Construction of Water Well for UP HQ Dor Baba, Nangarhar, Afghanistan
Contract#: W5J9JE-12-C-0115
Nature of Firm’s responsibility
Design and Construction MIACC was the prime contractor
Completion date
07/May/2013
Construction cost (including design)
$545,999.40
Duration of design
90
Duration of Construction
180 days
Project Owner
USACE
Project Scope:
The project was consisting of supply and installation of 20 meter high elevated water tank, construction of water well and installation of booster pump and pump house as well on ground water storage.