207 th Compound Expansion-Camp Zafar at Herat, Afghanistan
Contract#: W5J9LE-11-C-0033
Nature of Firm’s responsibility
Construction
Completion date
30/Oct/2012
Construction cost (including design)
US$- 270,250.00
Duration of Construction
90 days
Project Owner
CONTRACK International, Inc/USACE
Project Scope:
The project was consisting of interior paved road inside the 207 th Compound Expansion-Camp Zafar at Herat, Afghanistan. The total length of the road was 1.8 KM Asphalt road