| 6. DESIGN & CONSTRUCTION OF BARRACK BUILDINGS FOR ARMIES |
Project Name and Location |
BARRACK BUILDINGS FOR ARMIES IN NORTH SIDE CANTONMENT AREA (NSCA), KABUL INTERNATIONAL AIRPORT, AFGHANISTAN. |
Nature of Firm’s responsibility |
Design and Construction |
Completion date |
25/May/2008 |
 |
Construction cost (including design) |
US$- 2,900,000.00 |
Duration of design and Survey |
30 days |
Duration of Construction |
330 days |
Project Owner |
ITSI |
Project Scope: |
The project was a design built contract, consist of three enlisted Barracks double story, and one Senior Officer Barrack and each building was 2000 m2 total 8000m2. First floor slab was RCC and second floor was Trusses. In addition each Enlisted Barrack has the toilets showers area, and there was attached toilet/shower to each room for senior officer barrack |

|
|