Project Name and Location |
Design and Construction of National Police Coordination Center Electrical and Generator Upgrade
Contract#: W5J9JE-12-C-0016 |
Nature of Firm’s responsibility |
Design and Construction, MIACC was the prime contractor |
Completion date |
15/Apr/2012 |
 |
Construction cost (including design) |
$167,120.00 |
Duration of design and Survey |
45 |
Duration of Construction |
75 days |
Project Owner |
US Army Corps of Engineers / AED |
Project Scope: |
The Project work was consisting of replacing of all interior electrical system with new system and connection of the city power to NPCC (National Police Coordination Center inside the Ministry of Interior, Kabul, Afghanistan. |